Compressor requirement
• 320 KW power
• 1186 KW steam heating load
AVAR requirement
• 30 KW power
• 2,500 kg/h steam from exhaust gas
Installed at
Original consumption
• 150 KW refrigeration power
• 1186 KW steam heating load
AVAR replacement for same output
• 10 KW pump power
• 786 KW equivalent steam heat
Installed at
With above 85% operating efficiency and upto 310oC temperature using controlled fluid bed combustion of solid fuels. Over 92% efficiency on clean liquid / gas fuels.
Capacities for solid fuel
• From 1,000,000 Kcal/h
• Upto 3,000,000 Kcal/h
Capacities for liquid fuel / NG
• From 10,000 Kcal/h
• Upto 2,000,000 Kcal/h
Some installations
Custom designed heating / cooling solutions, evaporation plants, absorption towers and distillation columns for the process industry.
MEG Distillation Installed at Chevron Oronite
4 effect Na2S concentrator and flake plant. Installed at Victory Chemicals, Cuddalore